IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0340 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $340 $600 Not Implemented
AS0340 # 03 Y:2002 03 2002 INSTALL SKYLIGHTS $36,748 $54,898 Not Implemented
AS0340 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,190 $0 Not Implemented
AS0340 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $155 $20 Implemented
AS0340 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,051 $30 Not Implemented
AS0340 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $13,263 $6,971 Not Implemented
AS0340 # 08 Y:2002 08 2002 OPTIMIZE PLANT POWER FACTOR $6,618 $1,590 Not Implemented
AS0340 # 09 Y:2002 09 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,135 $13,732 Not Implemented
AS0340 # 10 Y:2002 10 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,400 $8,554 Not Implemented
AS0340 # 11 Y:2002 11 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,624 $4,800 Implemented
AS0340 # 12 Y:2002 12 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,500 $6,000 Not Implemented
AS0340 # 13 Y:2002 13 2002 CLEAR AND RENT EXISTING SPACE $60,660 $8,804 Implemented
AS0340 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $5,518 Implemented
NV0133 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,917 $9,200 Not Implemented
NV0133 # 06 Y:1999 06 1999 PAY UTILITY BILLS ON TIME $1,013 $0 Implemented
NV0133 # 04 Y:1999 04 1999 USE RADIANT HEATER FOR SPOT HEATING $6,458 $7,275 Not Implemented
NV0133 # 01 Y:1999 01 1999 REPLACE BOILER $20,745 $14,694 Implemented
NV0133 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,872 $5,370 Not Implemented
NV0133 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,194 $38,194 Not Implemented
NV0066 # 07 Y:1996 07 1996 HEAT WATER WITH EXHAUST HEAT $5,214 $3,300 Implemented
NV0066 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $90 $31 Implemented
NV0066 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,307 $270 Implemented
NV0066 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $200 Implemented
NV0066 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,678 $11,375 Not Implemented
NV0066 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $245 $94 Implemented