IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0542 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $1,900 Implemented
LE0542 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,492 $12,810 Implemented
LE0516 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,511 $200 Implemented
LE0516 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,124 $1,200 Implemented
LE0491 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,658 $14,000 Implemented
LE0491 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,952 $8,712 Implemented
LE0491 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,358 $20,000 Implemented
LE0434 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,784 $28 Implemented
LE0434 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $1,080 Implemented
LE0434 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $1,450 Implemented
LE0427 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,580 $3,500 Implemented
LE0427 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $14,438 Implemented
LE0427 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,621 $5,775 Implemented
LE0427 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $1,000 Implemented
LE0427 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,200 Implemented
LE0404 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,623 $1,000 Implemented
LE0404 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,793 $17,019 Implemented
LE0404 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $6,092 Implemented
LE0404 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,569 $36,281 Implemented
LE0404 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $7,827 $4,800 Implemented
LE0383 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,489 $40 Implemented
LE0383 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $300 Implemented
LE0191 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $200 Implemented
LE0191 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $4,530 $750 Implemented
LE0191 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,043 $2,500 Implemented