IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0564 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $70 Not Implemented
IA0564 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $914 $386 Not Implemented
IA0564 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,430 $1,680 Not Implemented
IA0564 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,878 $328 Not Implemented
IA0564 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,116 $5,057 Not Implemented
IA0564 # 02 Y:2016 02 2016 DISCONNECT BALLASTS $5,350 $3,960 Not Implemented
IA0564 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,030 $79,697 Not Implemented
BS0075 # 05 Y:2016 05 2016 MINIMIZE WATER USAGE $256 $53 Implemented
BS0075 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $7,616 $3,250 Implemented
BS0075 # 06 Y:2016 06 2016 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $73,741 $24,334 Implemented
BS0075 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,685 $1,464 Implemented
BS0075 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $52 Implemented
BS0075 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $502 Implemented
UD0950 # 03 Y:2016 03 2016 INSTALL TURBULATORS $1,055 $1,875 Not Implemented
UD0950 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $1,000 Implemented
UD0950 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $240 $460 Implemented
UD0950 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,530 $4,047 Not Implemented
UD0950 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,004 $1,452 Not Implemented
UD0950 # 07 Y:2016 07 2016 INSTALL AUTOMATIC STACK DAMPER $424 $484 Not Implemented
UD0950 # 06 Y:2016 06 2016 REDUCE EXCESSIVE BOILER BLOWDOWN $195 $0 Not Implemented
UD0950 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $671 $1,116 Not Implemented
UD0950 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,050 $671 Not Implemented
UD0950 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $1,295 $6,540 Not Implemented
UD0950 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,008 $10,000 Not Implemented
UD0950 # 01 Y:2016 01 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $5,935 $5,000 Not Implemented