Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
256
matching recommendationsSIC | 2671 | Paper Coated & Laminated, Packaging |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2306 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $336 | $600 | Implemented |
LE0542 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,492 | $12,810 | Implemented |
LE0542 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,207 | $1,900 | Implemented |
UW2202 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $135,581 | $876,160 | Implemented |
UW2202 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,538 | $9,763 | Implemented |
UW2202 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,645 | $10,782 | Implemented |
UW2202 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,233 | $12,913 | Implemented |
LE0516 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,511 | $200 | Implemented |
LE0516 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,124 | $1,200 | Implemented |
UF0557 # 08 Y:2020 | 08 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,710 | $5,998 | Implemented |
UF0557 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,870 | $8,850 | Implemented |
UF0557 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,548 | $2,336 | Implemented |
UF0557 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,993 | $25,529 | Implemented |
UF0557 # 07 Y:2020 | 07 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,282 | $25,340 | Implemented |
UF0557 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,904 | $455 | Implemented |
UF0557 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $33,607 | $165,000 | Implemented |
UF0557 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,350 | $150,000 | Implemented |
UU0172 # 08 Y:2021 | 08 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,268 | $212 | Implemented |
UU0172 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,439 | $15,243 | Implemented |
UU0172 # 06 Y:2021 | 06 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,039 | $17,334 | Implemented |
UU0172 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,814 | $7,952 | Implemented |
UU0172 # 09 Y:2021 | 09 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,679 | $1,200 | Implemented |
UU0172 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,543 | $100 | Implemented |
SD0590 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $319 | $585 | Implemented |
SD0590 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,948 | $0 | Implemented |