IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
Reset
SIC 2671 Paper Coated & Laminated, Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0392 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,627 $18,400 Not Implemented
LE0392 # 11 Y:2015 11 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,082 $2,210 Not Implemented
LE0392 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $1,733 Not Implemented
LE0392 # 13 Y:2015 13 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,472 $70,000 Not Implemented
LE0392 # 14 Y:2015 14 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $10,000 Not Implemented
LE0392 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,693 $13,275 Not Implemented
NC0482 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,366 $33,811 Implemented
NC0482 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,174 $132,415 Not Implemented
NC0482 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,539 $2,682 Not Implemented
NC0482 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,981 $2,248 Not Implemented
NC0482 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,540 $300,000 Not Implemented
NC0482 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,303 $4,000 Not Implemented
NC0482 # 07 Y:2013 07 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $14,522 $24,104 Not Implemented
NC0482 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,890 $100 Implemented
TT0100 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $3,000 Implemented
TT0100 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $360 Implemented
TT0100 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $4,500 Implemented
TT0100 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $407 $150 Implemented
TT0100 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,700 $3,000 Implemented
MZ0098 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,269 $850 Not Implemented
MZ0098 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,271 $1,283 Implemented
MZ0098 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,872 $400 Implemented
MZ0098 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,896 $3,000 Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented
MZ0098 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $35,790 $36,000 Implemented