Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 2672 | Paper Coated And Laminated, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,051 | $340 | Implemented |
WV0314 # 11 Y:2005 | 11 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $406 | $96 | Implemented |
WV0314 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $105 | Implemented |
WV0314 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $1,552 | $404 | Implemented |
WV0314 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,829 | $605 | Implemented |
WV0314 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,828 | $0 | Implemented |
WV0314 # 02 Y:2005 | 02 | 2005 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $14,277 | $70 | Implemented |
WV0314 # 01 Y:2005 | 01 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,732 | $3,713 | Implemented |
UD0626 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $2,526 | Implemented |
UD0626 # 09 Y:2001 | 09 | 2001 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $860 | $250 | Implemented |
UD0626 # 08 Y:2001 | 08 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,587 | $423 | Implemented |
UD0626 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,847 | $42 | Implemented |
UD0626 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,158 | $1,050 | Implemented |
UD0626 # 05 Y:2001 | 05 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,173 | $364 | Implemented |
UD0626 # 04 Y:2001 | 04 | 2001 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,451 | $112 | Implemented |
UD0626 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,326 | $1,000 | Implemented |
UD0626 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,653 | $0 | Implemented |
UD0145 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,579 | $19,613 | Implemented |