IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0627 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,215 $0 Implemented
NC0627 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,232 $500 Implemented
NC0627 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $925 $100 Not Implemented
NC0627 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,085 $345 Implemented
NC0627 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,799 $71,461 Implemented
NC0465 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,615 $10,250 Not Implemented
NC0465 # 11 Y:2012 11 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,007 $1,000 Implemented
NC0465 # 10 Y:2012 10 2012 INSULATE FEEDWATER TANK $464 $1,150 Implemented
NC0465 # 09 Y:2012 09 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $2,179 $1,000 Implemented
NC0465 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,343 $1,200 Implemented
NC0465 # 07 Y:2012 07 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,419 $16,000 Not Implemented
NC0465 # 06 Y:2012 06 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $2,959 $3,000 Implemented
NC0465 # 05 Y:2012 05 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $512 $0 Implemented
NC0465 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,645 $45,006 Implemented
NC0465 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,440 $200 Not Implemented
NC0465 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $400 Implemented
NC0421 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $9,751 $20,768 Implemented
NC0421 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,844 $100 Implemented
NC0421 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,180 $25,000 Not Implemented
NC0421 # 03 Y:2011 03 2011 REPAIR OR REPLACE STEAM TRAPS $12,484 $5,500 Implemented
NC0421 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,751 $25,000 Not Implemented
NC0421 # 01 Y:2011 01 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $28,591 $51,300 Not Implemented
NC0390 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $46,662 $67,500 Not Implemented
NC0390 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,223 $50,369 Not Implemented
NC0390 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $432 Not Implemented