Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2672 | Paper Coated And Laminated, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0627 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,215 | $0 | Implemented |
NC0627 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $28,232 | $500 | Implemented |
NC0627 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $925 | $100 | Not Implemented |
NC0627 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,085 | $345 | Implemented |
NC0627 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,799 | $71,461 | Implemented |
NC0465 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,615 | $10,250 | Not Implemented |
NC0465 # 11 Y:2012 | 11 | 2012 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,007 | $1,000 | Implemented |
NC0465 # 10 Y:2012 | 10 | 2012 | INSULATE FEEDWATER TANK | $464 | $1,150 | Implemented |
NC0465 # 09 Y:2012 | 09 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,179 | $1,000 | Implemented |
NC0465 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,343 | $1,200 | Implemented |
NC0465 # 07 Y:2012 | 07 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,419 | $16,000 | Not Implemented |
NC0465 # 06 Y:2012 | 06 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,959 | $3,000 | Implemented |
NC0465 # 05 Y:2012 | 05 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $512 | $0 | Implemented |
NC0465 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,645 | $45,006 | Implemented |
NC0465 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,440 | $200 | Not Implemented |
NC0465 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $400 | Implemented |
NC0421 # 06 Y:2011 | 06 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $9,751 | $20,768 | Implemented |
NC0421 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,844 | $100 | Implemented |
NC0421 # 04 Y:2011 | 04 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,180 | $25,000 | Not Implemented |
NC0421 # 03 Y:2011 | 03 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $12,484 | $5,500 | Implemented |
NC0421 # 02 Y:2011 | 02 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,751 | $25,000 | Not Implemented |
NC0421 # 01 Y:2011 | 01 | 2011 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $28,591 | $51,300 | Not Implemented |
NC0390 # 01 Y:2009 | 01 | 2009 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $46,662 | $67,500 | Not Implemented |
NC0390 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,223 | $50,369 | Not Implemented |
NC0390 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $379 | $432 | Not Implemented |