IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 2673 Bags: Plastics, Laminated, & Coated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0224 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,660 Implemented
MI0224 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,323 $3,480 Implemented
MI0224 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,947 $12,324 Implemented
MI0224 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,266 $11,960 Implemented
MI0224 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $1,230 Implemented
BD0414 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,204 $4,750 Implemented
WV0439 # 10 Y:2011 10 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,477 $144 Implemented
WV0439 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,194 $468 Implemented
WV0439 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,735 $96 Implemented
WV0439 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,648 $4,000 Implemented
WV0439 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $23,664 $1,202 Implemented
WV0439 # 15 Y:2011 15 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $631 $1,000 Implemented
WV0439 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $3,000 Implemented
WV0439 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $4,234 $972 Implemented
LL0362 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,621 $360 Implemented
LL0362 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,629 $61,377 Implemented
LL0362 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,083 $810 Implemented
MZ0064 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,258 $1,800 Implemented
MZ0064 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,083 $6,900 Implemented
MZ0064 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,225 $57,800 Implemented
MZ0064 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $12,142 $3,680 Implemented
MZ0064 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,520 $8,600 Implemented
MZ0064 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,612 $0 Implemented
CO0640 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $3,060 Implemented
CO0640 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,720 $1,140 Implemented