IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 2675 Die-cut Paper And Board
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0045 # 08 Y:2025 08 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,247 $910 n/a
CI0045 # 07 Y:2025 07 2025 RECOVER WASTE HEAT FROM EQUIPMENT $3,694 $5,000 n/a
CI0045 # 06 Y:2025 06 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,072 $25,000 n/a
CI0045 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $13,658 $2,310 n/a
CI0045 # 04 Y:2025 04 2025 USE PHOTOCELL CONTROLS $36,786 $6,000 n/a
CI0045 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,467 $293,581 n/a
CI0045 # 02 Y:2025 02 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $118,038 $200,000 n/a
CI0045 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $360,332 $3,128,595 n/a
MS0412 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $10,030 $96,425 Not Implemented
MS0412 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $108 $0 Not Implemented
MS0412 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,039 $17,808 Not Implemented
MS0412 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $3,382 $1,476 Not Implemented
NC0541 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $627 $470 Not Implemented
NC0541 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $935 $4,256 Not Implemented
NC0541 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $116 $240 Not Implemented
NC0541 # 06 Y:2015 06 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,054 $5,000 Not Implemented
NC0541 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $104 $100 Implemented
NC0541 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $596 $160 Implemented
NC0541 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $536 $918 Not Implemented
NC0541 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $3,000 Not Implemented
NC0541 # 12 Y:2015 12 2015 INSTALL TIMERS AND/OR THERMOSTATS $308 $600 Not Implemented
NC0541 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,334 $1,131 Not Implemented
NC0541 # 01 Y:2015 01 2015 DEVELOP STANDARD OPERATING PROCEDURES $27,300 $10,000 Not Implemented
NC0541 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $299 $405 Not Implemented
TT0105 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,590 $1,500 Implemented