Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsSIC | 2675 | Die-cut Paper And Board |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0045 # 08 Y:2025 | 08 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,247 | $910 | n/a |
CI0045 # 07 Y:2025 | 07 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,694 | $5,000 | n/a |
CI0045 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,072 | $25,000 | n/a |
CI0045 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $13,658 | $2,310 | n/a |
CI0045 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $36,786 | $6,000 | n/a |
CI0045 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,467 | $293,581 | n/a |
CI0045 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $118,038 | $200,000 | n/a |
CI0045 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $360,332 | $3,128,595 | n/a |
MS0412 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,030 | $96,425 | Not Implemented |
MS0412 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $108 | $0 | Not Implemented |
MS0412 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,039 | $17,808 | Not Implemented |
MS0412 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $3,382 | $1,476 | Not Implemented |
NC0541 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $627 | $470 | Not Implemented |
NC0541 # 11 Y:2015 | 11 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $935 | $4,256 | Not Implemented |
NC0541 # 10 Y:2015 | 10 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $116 | $240 | Not Implemented |
NC0541 # 06 Y:2015 | 06 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,054 | $5,000 | Not Implemented |
NC0541 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $104 | $100 | Implemented |
NC0541 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $596 | $160 | Implemented |
NC0541 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $536 | $918 | Not Implemented |
NC0541 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $634 | $3,000 | Not Implemented |
NC0541 # 12 Y:2015 | 12 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $308 | $600 | Not Implemented |
NC0541 # 02 Y:2015 | 02 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,334 | $1,131 | Not Implemented |
NC0541 # 01 Y:2015 | 01 | 2015 | DEVELOP STANDARD OPERATING PROCEDURES | $27,300 | $10,000 | Not Implemented |
NC0541 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $299 | $405 | Not Implemented |
TT0105 # 01 Y:2013 | 01 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,590 | $1,500 | Implemented |