IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

449

matching recommendations
Reset
SIC 2677 Envelopes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0319 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,000 $840 Not Implemented
CO0319 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,100 $210 Not Implemented
HO0066 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,343 $7,966 Not Implemented
HO0066 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,343 $12,043 Implemented
HO0066 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,480 $1,890 Not Implemented
HO0066 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,586 $2,100 Not Implemented
HO0066 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,470 $10,000 Not Implemented
HO0060 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,164 $2,218 Implemented
HO0060 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,071 $1,799 Implemented
HO0060 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,189 $1,346 Implemented
HO0060 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,033 $500 Implemented
UF0061 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,496 $247 Implemented
UF0061 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $2,604 Implemented
UF0061 # 03 Y:1993 03 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $6,088 $6,904 Not Implemented
UF0061 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,214 $0 Not Implemented
UF0061 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $1,456 $1,076 Not Implemented
UF0061 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,891 $4,866 Not Implemented
UF0061 # 07 Y:1993 07 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,081 $0 Not Implemented
UF0061 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $290 $134 Implemented
UF0061 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,623 $1,440 Implemented
UF0061 # 10 Y:1993 10 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $133 $50 Not Implemented
UF0061 # 11 Y:1993 11 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $719 $2,846 Not Implemented
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented
AM0165 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,915 $3,450 Not Implemented