IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2677 Envelopes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0143 # 06 Y:2002 06 2002 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $42,656 $128,836 Not Implemented
SU0143 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,656 $420 Implemented
SU0143 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,432 $300 Not Implemented
SU0143 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,371 $3,000 Implemented
SU0143 # 02 Y:2002 02 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $4,584 $10,455 Implemented
SU0143 # 01 Y:2002 01 2002 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $29,798 $32,697 Implemented
SU0137 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $806 $2,150 Not Implemented
SU0137 # 08 Y:2002 08 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,580 $510 Implemented
SU0137 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,451 $0 Implemented
SU0137 # 06 Y:2002 06 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,312 $327 Not Implemented
SU0137 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,228 $327 Implemented
SU0137 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $923 $3,750 Not Implemented
SU0137 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $429 $71 Implemented
SU0137 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $0 Implemented
HO0150 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,148 $31,658 Not Implemented
HO0150 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $390 $100 Implemented
HO0150 # 08 Y:1997 08 1997 USE RADIANT HEATER FOR SPOT HEATING $956 $3,000 Implemented
HO0150 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,238 $20,020 Not Implemented
HO0150 # 06 Y:1997 06 1997 REDUCE HEAT GAIN BY WINDOW TINTING $5,161 $7,590 Not Implemented
HO0150 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,000 $6,500 Not Implemented
HO0150 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,566 $60 Not Implemented
HO0150 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $413 $310 Implemented
HO0150 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $791 $700 Implemented