IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
SIC 2677 Envelopes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0143 # 06 Y:2002 06 2002 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $42,656 $128,836 Not Implemented
SU0143 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,656 $420 Implemented
SU0143 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,432 $300 Not Implemented
SU0143 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,371 $3,000 Implemented
SU0143 # 02 Y:2002 02 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $4,584 $10,455 Implemented
SU0143 # 01 Y:2002 01 2002 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $29,798 $32,697 Implemented
SU0137 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $0 Implemented
SU0137 # 08 Y:2002 08 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,580 $510 Implemented
SU0137 # 06 Y:2002 06 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,312 $327 Not Implemented
SU0137 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,228 $327 Implemented
SU0137 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $923 $3,750 Not Implemented
SU0137 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $806 $2,150 Not Implemented
SU0137 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $429 $71 Implemented
SU0137 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,451 $0 Implemented
GT0730 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,840 $250 Implemented
GT0730 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,409 $4,000 Not Implemented
GT0730 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,760 $21,000 Not Implemented
GT0730 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $725 $330 Implemented
GT0730 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $756 $270 Implemented
GT0730 # 07 Y:2002 07 2002 PAY UTILITY BILLS ON TIME $993 $0 Implemented
GT0730 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $31,900 $150,000 Not Implemented
WV0236 # 12 Y:2002 12 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $21,840 $13,000 Not Implemented
WV0236 # 09 Y:2002 09 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,994 $560 Implemented
WV0236 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,272 $750 Implemented
WV0236 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,206 $3,600 Implemented