IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

239

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0003 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $600 Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
UA3009 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,274 $5,000 Implemented
UA3009 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $592 $623 Implemented
UA3009 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,597 $265 Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
SU0290 # 11 Y:2010 11 2010 REDUCE VENTILATION AIR $7,633 $10,197 Implemented
SU0290 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,822 $0 Implemented
SU0290 # 02 Y:2010 02 2010 DISCONNECT BALLASTS $2,268 $0 Implemented
SU0290 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $200 Implemented
SU0290 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $421 $357 Implemented
SU0290 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $335 Implemented
SU0290 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $186 $268 Implemented
SU0290 # 14 Y:2010 14 2010 OPTIMIZE PLANT POWER FACTOR $1,087 $6,486 Implemented
UD0804 # 08 Y:2009 08 2009 KEEP BOILER TUBES CLEAN $8,490 $600 Implemented
UD0804 # 05 Y:2009 05 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,277 $500 Implemented
UD0804 # 04 Y:2009 04 2009 REPAIR OR REPLACE STEAM TRAPS $23,089 $4,000 Implemented
UD0804 # 11 Y:2009 11 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,128 $0 Implemented
UD0804 # 15 Y:2009 15 2009 ISOLATE HOT OR COLD EQUIPMENT $1,306 $0 Implemented
UD0804 # 03 Y:2009 03 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $35,001 $9,000 Implemented
UD0804 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $38,869 $12,000 Implemented
MA0631 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $200 Implemented
MA0631 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,021 $0 Implemented