Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
520
matching recommendationsSIC | 2679 | Converted Paper Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0115 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,177 | $475 | Implemented |
LT0115 # 07 Y:1988 | 07 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $716 | $315 | Not Implemented |
LT0115 # 08 Y:1988 | 08 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $365 | $0 | Implemented |
LT0115 # 09 Y:1988 | 09 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $564 | $890 | Implemented |
LT0115 # 10 Y:1988 | 10 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $185 | $69 | Implemented |
LT0115 # 11 Y:1988 | 11 | 1988 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $313 | $50 | Implemented |
LT0115 # 12 Y:1988 | 12 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $870 | $2,000 | Not Implemented |
UD0226 # 01 Y:1987 | 01 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,972 | $2,565 | Implemented |
UD0226 # 02 Y:1987 | 02 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,458 | $30,000 | Not Implemented |
UD0226 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,151 | $1,232 | Implemented |
UD0226 # 04 Y:1987 | 04 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,040 | $24,000 | Implemented |
UD0226 # 05 Y:1987 | 05 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,236 | $0 | Not Implemented |
KU0204 # 01 Y:1986 | 01 | 1986 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $50,936 | $300,000 | Not Implemented |
KU0204 # 02 Y:1986 | 02 | 1986 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $8,720 | $3,000 | Not Implemented |
KU0204 # 03 Y:1986 | 03 | 1986 | IMPROVE LUBRICATION PRACTICES | $2,017 | $1,600 | Implemented |
KU0204 # 04 Y:1986 | 04 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,220 | $700 | Implemented |
KU0204 # 05 Y:1986 | 05 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $715 | $0 | Implemented |
KU0204 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $335 | $0 | Implemented |
KU0204 # 07 Y:1986 | 07 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $732 | $30 | Implemented |
KU0204 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $576 | $50 | Implemented |
KU0204 # 09 Y:1986 | 09 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $155 | $100 | Implemented |
KU0204 # 10 Y:1986 | 10 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $126 | $0 | Not Implemented |
AT0022 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $449 | $422 | Implemented |
AT0022 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,673 | $300 | Implemented |
AT0022 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $0 | Implemented |