IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,540

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0342 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,094 $888 Implemented
IA0342 # 04 Y:2004 04 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,701 $1,500 Implemented
IA0342 # 06 Y:2004 06 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $7,150 $715 Implemented
LL0187 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,409 $135 Implemented
LL0187 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,426 $1,560 Implemented
LL0187 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $400 Implemented
LL0187 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $300 Implemented
LL0187 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $167 $120 Implemented
LL0187 # 09 Y:2004 09 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,500 $60 Implemented
UF0341 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,921 $4,090 Implemented
UF0341 # 03 Y:2004 03 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,360 $65 Implemented
UF0341 # 04 Y:2004 04 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,907 $1,200 Implemented
SU0186 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $12,704 $0 Implemented
SU0186 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,485 $1,693 Implemented
SU0186 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,635 $400 Implemented
SU0186 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $236 $154 Implemented
SU0186 # 08 Y:2004 08 2004 USE SYNTHETIC LUBRICANT $1,467 $1,000 Implemented
SU0186 # 09 Y:2004 09 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,324 $1,305 Implemented
SU0181 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,244 $0 Implemented
SU0181 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,188 $1,545 Implemented
SU0181 # 07 Y:2004 07 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,229 $368 Implemented
GT0779 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,183 $5,000 Implemented
GT0779 # 02 Y:2004 02 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $590 $2,700 Implemented
GT0779 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $300 Implemented
GT0779 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $303 $1,000 Implemented