IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,540

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0146 # 15 Y:1984 15 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $215 $0 Implemented
KU0146 # 16 Y:1984 16 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $4,120 $0 Implemented
KU0146 # 17 Y:1984 17 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $153 $150 Implemented
KU0146 # 18 Y:1984 18 1984 INSTALL AUTOMATIC STACK DAMPER $1,822 $1,400 Implemented
KU0146 # 19 Y:1984 19 1984 INSTALL TURBULATORS $1,427 $1,176 Implemented
KU0146 # 20 Y:1984 20 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $0 Implemented
KU0146 # 21 Y:1984 21 1984 INSTALL AUTOMATIC STACK DAMPER $1,821 $1,400 Implemented
KU0146 # 22 Y:1984 22 1984 INSTALL TURBULATORS $1,530 $1,750 Implemented
KU0140 # 18 Y:1984 18 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $30 Implemented
KU0140 # 19 Y:1984 19 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $165 $90 Implemented
KU0131 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,281 $200 Implemented
KU0131 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $170 Implemented
KU0131 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $350 Implemented
KU0131 # 13 Y:1984 13 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $396 $0 Implemented
KU0131 # 14 Y:1984 14 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $330 $0 Implemented
KU0131 # 16 Y:1984 16 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $136 $0 Implemented
KU0131 # 19 Y:1984 19 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $113 $39 Implemented
KU0136 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,567 $176 Implemented
KU0136 # 14 Y:1984 14 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,003 $215 Implemented
KU0136 # 15 Y:1984 15 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,345 $2,500 Implemented
KU0136 # 16 Y:1984 16 1984 RECOVER WASTE HEAT FROM EQUIPMENT $699 $350 Implemented
KU0136 # 18 Y:1984 18 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $550 Implemented
KU0136 # 19 Y:1984 19 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $387 $120 Implemented
KU0136 # 20 Y:1984 20 1984 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $219 $400 Implemented
KU0136 # 21 Y:1984 21 1984 IMPROVE LUBRICATION PRACTICES $2,590 $2,550 Implemented