IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0600 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,507 $5,000 Not Implemented
MA0600 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,683 $2,000 Not Implemented
MA0600 # 01 Y:2006 01 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $24,000 $0 Not Implemented
MA0600 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $5,321 $10,000 Not Implemented
MA0600 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,209 $17,438 Not Implemented
MA0600 # 02 Y:2006 02 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,271 $12,700 Not Implemented
MA0598 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $300 Implemented
MA0598 # 06 Y:2006 06 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $716 $500 Not Implemented
MA0598 # 05 Y:2006 05 2006 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $2,571 $3,000 Not Implemented
MA0598 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $4,500 $4,314 Implemented
MA0598 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $25,324 $45,333 Not Implemented
MA0598 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,748 $1,125 Implemented
MA0598 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,315 $18,065 Implemented
MA0514 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,407 $0 Not Implemented
MA0514 # 09 Y:2002 09 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $177 $281 Implemented
MA0514 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $214 $262 Not Implemented
MA0514 # 07 Y:2002 07 2002 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $519 $900 Not Implemented
MA0514 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,569 $0 Implemented
MA0514 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,214 $500 Implemented
MA0514 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $40,968 $200,000 Not Implemented
MA0514 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,892 $0 Implemented
MA0514 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,996 $5,000 Not Implemented
MA0501 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $5,838 $9,990 Implemented
MA0501 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $4,410 $2,500 Implemented
MA0501 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,219 $2,162 Not Implemented