IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0136 # 13 Y:1984 13 1984 INSTALL TURBULATORS $357 $600 Not Implemented
KU0136 # 14 Y:1984 14 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,003 $215 Implemented
KU0136 # 15 Y:1984 15 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,345 $2,500 Implemented
KU0136 # 16 Y:1984 16 1984 RECOVER WASTE HEAT FROM EQUIPMENT $699 $350 Implemented
KU0136 # 17 Y:1984 17 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $757 $25 Not Implemented
KU0136 # 18 Y:1984 18 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $550 Implemented
KU0136 # 19 Y:1984 19 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $387 $120 Implemented
KU0136 # 20 Y:1984 20 1984 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $219 $400 Implemented
KU0136 # 21 Y:1984 21 1984 IMPROVE LUBRICATION PRACTICES $2,590 $2,550 Implemented
KU0136 # 22 Y:1984 22 1984 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,867 $2,640 Not Implemented
KU0136 # 23 Y:1984 23 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $795 $0 Implemented
KU0136 # 24 Y:1984 24 1984 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $391 $97 Not Implemented
KU0136 # 25 Y:1984 25 1984 INSULATE BARE EQUIPMENT $364 $75 Not Implemented
KU0136 # 26 Y:1984 26 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $347 $50 Not Implemented
KU0136 # 27 Y:1984 27 1984 INSULATE BARE EQUIPMENT $98 $100 Not Implemented
KU0137 # 01 Y:1984 01 1984 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $4,772 $4,500 Not Implemented
KU0137 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,839 $0 Implemented
KU0137 # 03 Y:1984 03 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,293 $0 Not Implemented
KU0137 # 04 Y:1984 04 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $250 $90 Not Implemented
KU0137 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $0 Implemented
KU0137 # 06 Y:1984 06 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,472 $2,000 Not Implemented
KU0137 # 07 Y:1984 07 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,169 $400 Not Implemented
KU0137 # 08 Y:1984 08 1984 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $1,200 $1,670 Not Implemented
KU0137 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $754 $750 Not Implemented
KU0137 # 10 Y:1984 10 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $20 Not Implemented