IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0731 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,130 $0 Not Implemented
UD0731 # 05 Y:2005 05 2005 CONDENSE OPERATION INTO ONE BUILDING $13,200 $0 Not Implemented
UD0731 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,198 $0 Not Implemented
UD0731 # 03 Y:2005 03 2005 USE POWER DURING OFF-PEAK PERIODS $24,427 $0 Not Implemented
UD0731 # 02 Y:2005 02 2005 CONDENSE OPERATION INTO ONE BUILDING $28,800 $0 Not Implemented
UD0731 # 01 Y:2005 01 2005 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $54,200 $60,000 Implemented
UD0717 # 05 Y:2005 05 2005 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $12,000 $2,300 Not Implemented
UD0717 # 01 Y:2005 01 2005 INCREASE USE OF AUTOMATION $68,000 $145,000 Implemented
UD0717 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,398 $0 Not Implemented
UD0717 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,783 $39,200 Implemented
UD0717 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $12,702 $5,400 Implemented
UD0717 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,225 $0 Implemented
UD0717 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,553 $11,448 Implemented
UD0717 # 09 Y:2005 09 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,658 $2,526 Implemented
UD0717 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,395 $0 Not Implemented
UD0717 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $441 $882 Not Implemented
UD0717 # 12 Y:2005 12 2005 INSULATE BARE EQUIPMENT $670 $780 Not Implemented
UD0717 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,845 $0 Not Implemented
UD0717 # 11 Y:2005 11 2005 USE OPTIMUM THICKNESS INSULATION $1,314 $1,962 Not Implemented
UD0705 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,816 $10,800 Not Implemented
UD0705 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,980 $0 Not Implemented
UD0705 # 03 Y:2004 03 2004 REDUCE SCRAP PRODUCTION $12,990 $0 Implemented
UD0705 # 02 Y:2004 02 2004 DEVELOP STANDARD OPERATING PROCEDURES $23,264 $30,000 Not Implemented
UD0705 # 01 Y:2004 01 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $50,000 $50,000 Implemented
UD0705 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $304 Not Implemented