IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0184 # 06 Y:2011 06 2011 USE RADIANT HEATER FOR SPOT HEATING $2,000 $7,588 Implemented
IC0184 # 07 Y:2011 07 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $65,425 $345,000 Not Implemented
UW0053 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,663 $160,551 Implemented
UW0053 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,673 $11,000 Implemented
UW0053 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,936 $1,900 Implemented
UW0053 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,830 $21,939 Not Implemented
UW0053 # 05 Y:2011 05 2011 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $3,594 $3,150 Not Implemented
MI0204 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,841 $46,645 Not Implemented
MI0204 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,475 $1,320 Implemented
MI0204 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,367 $2,550 Implemented
MI0204 # 04 Y:2011 04 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,856 $9,183 Not Implemented
MI0204 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $9,600 Not Implemented
MI0204 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $50 Implemented
MI0204 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,858 $3,943 Not Implemented
MI0204 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,252 $4,571 Not Implemented
SU0304 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,207 $0 Implemented
SU0304 # 02 Y:2011 02 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $992 $0 Implemented
SU0304 # 03 Y:2011 03 2011 USE SYNTHETIC LUBRICANT $202 $0 Not Implemented
SU0304 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22 $0 Implemented
SU0304 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $539 Not Implemented
SU0304 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $435 $467 Not Implemented
SU0304 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $214 $712 Not Implemented
SU0304 # 08 Y:2011 08 2011 UPGRADE OBSOLETE EQUIPMENT $737 $2,660 Implemented
SU0304 # 09 Y:2011 09 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $869 $4,748 Not Implemented
IA0461 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,898 $1,649 Not Implemented