Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,640
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0387 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $405 | $1,550 | Not Implemented |
TA0115 # 01 Y:2006 | 01 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $6,840 | $190 | Not Implemented |
TA0115 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,445 | $210 | Not Implemented |
TA0115 # 03 Y:2006 | 03 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,295 | $0 | Not Implemented |
TA0115 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $900 | $1,500 | Not Implemented |
TA0115 # 05 Y:2006 | 05 | 2006 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $2,645 | $4,760 | Not Implemented |
AS0418 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,182 | $15,913 | n/a |
AS0418 # 02 Y:2006 | 02 | 2006 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $15,053 | $0 | n/a |
AS0418 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,196 | $0 | n/a |
AS0418 # 04 Y:2006 | 04 | 2006 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $6,612 | $550 | n/a |
AS0418 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,272 | $1,000 | n/a |
AS0418 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,394 | $1,900 | n/a |
AS0418 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,386 | $3,000 | n/a |
AS0418 # 08 Y:2006 | 08 | 2006 | USE SOLAR HEAT TO HEAT WATER | $358 | $2,800 | n/a |
MA0600 # 01 Y:2006 | 01 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,000 | $0 | Not Implemented |
MA0600 # 02 Y:2006 | 02 | 2006 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,271 | $12,700 | Not Implemented |
MA0600 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,209 | $17,438 | Not Implemented |
MA0600 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $5,321 | $10,000 | Not Implemented |
MA0600 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,683 | $2,000 | Not Implemented |
MA0600 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,507 | $5,000 | Not Implemented |
WV0335 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $151,578 | $97,142 | Not Implemented |
WV0335 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $127,911 | $14,450 | Implemented |
WV0335 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,924 | $250 | Not Implemented |
WV0335 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $6,057 | $240 | Implemented |
WV0335 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $1,420 | Implemented |