IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

250

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented
HO0218 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $4,499 $2,640 Implemented
HO0218 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,069 $0 Implemented
HO0218 # 05 Y:2000 05 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,825 $5,000 Not Implemented
HO0218 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,400 $20,000 Not Implemented
HO0218 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $37,179 $0 Implemented
HO0199 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $450 $1,200 Not Implemented
HO0199 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,100 $0 Implemented
HO0199 # 03 Y:1999 03 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,627 $1,300 Implemented
HO0199 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,503 $750 Implemented
HO0199 # 05 Y:1999 05 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $2,808 $5,000 Implemented
HO0199 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $4,680 $150 Implemented
HO0199 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,520 $28,000 Not Implemented
HO0184 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $1,525 Implemented
HO0184 # 02 Y:1998 02 1998 KEEP LAMPS AND REFLECTORS CLEAN $1,669 $0 Implemented
HO0184 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,692 $946 Not Implemented
HO0184 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $500 Not Implemented
HO0184 # 05 Y:1998 05 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,835 $0 Implemented
HO0184 # 06 Y:1998 06 1998 MAINTAIN MACHINES TO REDUCE LEAKS $360 $100 Implemented
HO0184 # 07 Y:1998 07 1998 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $5,850 $500 Not Implemented
HO0184 # 08 Y:1998 08 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,469 $200 Implemented
HO0184 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,459 $27,500 Not Implemented
HO0149 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,800 $33,870 Not Implemented
HO0149 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $358 Not Implemented
HO0149 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $367 $400 Not Implemented