IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0598 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $300 Implemented
MA0598 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $4,500 $4,314 Implemented
MA0598 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,315 $18,065 Implemented
MA0598 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,748 $1,125 Implemented
MA0514 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,892 $0 Implemented
MA0514 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,569 $0 Implemented
MA0514 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,214 $500 Implemented
MA0514 # 09 Y:2002 09 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $177 $281 Implemented
MA0501 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,983 $6,000 Implemented
MA0501 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,653 $46,540 Implemented
MA0501 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $5,838 $9,990 Implemented
MA0501 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $4,410 $2,500 Implemented
MA0501 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $736 $300 Implemented
MA0501 # 07 Y:2001 07 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $264 $0 Implemented
MA0307 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,970 $886 Implemented
MA0307 # 07 Y:1994 07 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $666 $540 Implemented
MA0307 # 05 Y:1994 05 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $906 $3,063 Implemented
MA0307 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $648 Implemented
MA0307 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $756 $99 Implemented
MA0294 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Implemented
MA0294 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $91 Implemented
MA0220 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $2,264 $200 Implemented
MA0220 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $926 $176 Implemented
MA0220 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $952 $170 Implemented
MA0220 # 05 Y:1991 05 1991 REPAIR OR REPLACE STEAM TRAPS $4,682 $0 Implemented