Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,080
matching recommendationsSIC | 271 | Newspapers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0315 # 07 Y:2003 | 07 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $14,685 | $20,500 | Not Implemented |
UF0315 # 08 Y:2003 | 08 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,301 | $260 | Implemented |
UF0315 # 09 Y:2003 | 09 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,266 | $1,895 | Not Implemented |
UF0312 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,162 | $7,981 | Implemented |
UF0312 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,258 | $6,000 | Not Implemented |
UF0312 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,934 | $500 | Not Implemented |
UF0312 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,427 | $20,000 | Implemented |
UF0312 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,400 | $31,277 | Not Implemented |
UF0312 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,131 | $1,074 | Implemented |
WI0426 # 01 Y:2002 | 01 | 2002 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $4,113 | $0 | Not Implemented |
WI0426 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,187 | $8,714 | Implemented |
WI0426 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,916 | $150 | Implemented |
WI0426 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,333 | $0 | Implemented |
WI0426 # 05 Y:2002 | 05 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $797 | $800 | Not Implemented |
WI0426 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $640 | Not Implemented |
WI0426 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $243 | $1,000 | Not Implemented |
LL0136 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $10,620 | $15,435 | Not Implemented |
LL0136 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,546 | $0 | Not Implemented |
LL0136 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,800 | $1,080 | Implemented |
LL0136 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,311 | $0 | Not Implemented |
LL0136 # 05 Y:2002 | 05 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,079 | $2,307 | Implemented |
LL0136 # 06 Y:2002 | 06 | 2002 | USE PHOTOCELL CONTROLS | $1,293 | $260 | Not Implemented |
LL0136 # 07 Y:2002 | 07 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,505 | $2,255 | Implemented |
LL0136 # 08 Y:2002 | 08 | 2002 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $3,855 | $0 | Implemented |
MA0501 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,983 | $6,000 | Implemented |