IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,080

matching recommendations
Reset
SIC 2711 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0315 # 07 Y:2003 07 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,685 $20,500 Not Implemented
UF0315 # 08 Y:2003 08 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,301 $260 Implemented
UF0315 # 09 Y:2003 09 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,266 $1,895 Not Implemented
UF0312 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,162 $7,981 Implemented
UF0312 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $1,258 $6,000 Not Implemented
UF0312 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,934 $500 Not Implemented
UF0312 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,427 $20,000 Implemented
UF0312 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $38,400 $31,277 Not Implemented
UF0312 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,131 $1,074 Implemented
WI0426 # 01 Y:2002 01 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,113 $0 Not Implemented
WI0426 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,187 $8,714 Implemented
WI0426 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $150 Implemented
WI0426 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,333 $0 Implemented
WI0426 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $797 $800 Not Implemented
WI0426 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $640 Not Implemented
WI0426 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $243 $1,000 Not Implemented
LL0136 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $10,620 $15,435 Not Implemented
LL0136 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,546 $0 Not Implemented
LL0136 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,800 $1,080 Implemented
LL0136 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,311 $0 Not Implemented
LL0136 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,079 $2,307 Implemented
LL0136 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $1,293 $260 Not Implemented
LL0136 # 07 Y:2002 07 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,505 $2,255 Implemented
LL0136 # 08 Y:2002 08 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,855 $0 Implemented
MA0501 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,983 $6,000 Implemented