IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,080

matching recommendations
Reset
SIC 2711 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0501 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,653 $46,540 Implemented
MA0501 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $5,838 $9,990 Implemented
MA0501 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $4,410 $2,500 Implemented
MA0501 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,219 $2,162 Not Implemented
MA0501 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $736 $300 Implemented
MA0501 # 07 Y:2001 07 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $264 $0 Implemented
UF0281 # 01 Y:2001 01 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,061 $50,725 Not Implemented
UF0281 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,622 $1,402 Implemented
UF0281 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,786 $2,400 Implemented
UF0281 # 04 Y:2001 04 2001 DEVELOP A REPAIR/REPLACE POLICY $3,709 $2,520 Not Implemented
UF0281 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,886 $410 Not Implemented
UF0281 # 06 Y:2001 06 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,597 $0 Not Implemented
UF0281 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,098 $0 Not Implemented
UF0281 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $855 $553 Implemented
UF0281 # 09 Y:2001 09 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,370 $90,464 Implemented
UF0281 # 10 Y:2001 10 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,800 $0 Implemented
UF0281 # 11 Y:2001 11 2001 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $168,000 $240 Not Implemented
UF0281 # 12 Y:2001 12 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $67,200 $9,733 Not Implemented
WI0394 # 01 Y:2001 01 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $32,472 $1,611 n/a
WI0394 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,875 $34,038 n/a
WI0394 # 03 Y:2001 03 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,800 $0 n/a
WI0394 # 04 Y:2001 04 2001 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,549 $9,975 n/a
WI0394 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,778 $2,000 n/a
WI0394 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,579 $1,280 n/a
WI0394 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,450 $1,263 n/a