IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,451

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0220 # 05 Y:1991 05 1991 REPAIR OR REPLACE STEAM TRAPS $4,682 $0 Implemented
MA0220 # 06 Y:1991 06 1991 INSTALL STORM WINDOWS AND DOORS $6,712 $50,000 Implemented
MA0220 # 07 Y:1991 07 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,148 $0 Implemented
OK0336 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,033 $0 Implemented
OK0336 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,157 $7,830 Implemented
OK0336 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,221 $7,915 Implemented
OK0336 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,632 $10,000 Implemented
OK0336 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,951 $0 Implemented
OK0336 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $0 Implemented
RU0106 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $798 $0 Implemented
RU0106 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $648 $0 Implemented
RU0106 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $507 $800 Implemented
RU0106 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $645 $500 Implemented
RU0106 # 05 Y:1991 05 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,924 $0 Implemented
RU0106 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,160 $218 Implemented
AS0012 # 01 Y:1990 01 1990 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $2,892 $1,800 Implemented
AS0012 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,435 $2,241 Implemented
AS0012 # 07 Y:1990 07 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $111 $107 Implemented
OK0317 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,265 $1,050 Implemented
OK0317 # 03 Y:1990 03 1990 INSTALL TURBULATORS $429 $675 Implemented
UD0313 # 01 Y:1990 01 1990 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,744 $20,000 Implemented
UD0313 # 02 Y:1990 02 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $700 Implemented
UD0313 # 04 Y:1990 04 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,376 $25,000 Implemented
UD0315 # 01 Y:1990 01 1990 INSTALL STORM WINDOWS AND DOORS $12,565 $12,000 Implemented
UD0315 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $50,970 $40,000 Implemented