Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0360 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,342 | $1,000 | Implemented |
LE0360 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $366 | $80 | Implemented |
LE0360 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,806 | $3,200 | Implemented |
LE0360 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,056 | $8,300 | Implemented |
LE0360 # 09 Y:2013 | 09 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $691 | $700 | Implemented |
LE0223 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $0 | Implemented |
LE0223 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $375 | $300 | Implemented |
LE0223 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $1,000 | Implemented |
LE0223 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $844 | $80 | Implemented |
LE0223 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,650 | $50 | Implemented |
LE0223 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,831 | $2,500 | Implemented |
LE0223 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,281 | $100 | Implemented |
LE0223 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,391 | $250 | Implemented |
LE0149 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $1,441 | $260 | Implemented |
LE0149 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,655 | $340 | Implemented |
LE0149 # 08 Y:2002 | 08 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $4,252 | $2,100 | Implemented |
LE0149 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $472 | $75 | Implemented |
LE0149 # 06 Y:2002 | 06 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $886 | $750 | Implemented |
LE0149 # 05 Y:2002 | 05 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,578 | $25,000 | Implemented |
LE0149 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,547 | $1,200 | Implemented |
LE0149 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,182 | $1,000 | Implemented |
LE0104 # 04 Y:2001 | 04 | 2001 | IMPROVE LUBRICATION PRACTICES | $378 | $400 | Implemented |
LE0104 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $630 | $0 | Implemented |
LE0104 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $393 | $550 | Implemented |
RU0164 # 01 Y:1992 | 01 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $0 | Implemented |