Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0955 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $2,140 Implemented
OK0955 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $11,297 Implemented
OK0955 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,112 $1,100 Implemented
OK0955 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,925 $572 Implemented
OK0955 # 03 Y:2016 03 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $598 $220 Implemented
OK0955 # 02 Y:2016 02 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,478 $10,800 Implemented
OK0708 # 07 Y:2005 07 2005 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,070 $700 Implemented
OK0708 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,450 $26,280 Implemented
OK0708 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $37,832 $13,050 Implemented
OK0708 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $1,327 Implemented
OK0708 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $6,700 Implemented
OK0708 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,172 $6,087 Implemented
OK0537 # 07 Y:1997 07 1997 RECYCLE WASTE INK AND CLEANUP SOLVENT $500 $1,300 Implemented
OK0537 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $793 $1,000 Implemented
OK0537 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $33,000 $65,000 Implemented
OK0485 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,970 $29,500 Implemented
OK0485 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $428 $786 Implemented
OK0485 # 02 Y:1996 02 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,827 $2,730 Implemented
OK0478 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,374 $48,000 Implemented
OK0478 # 10 Y:1995 10 1995 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $6,080 $500 Implemented
OK0478 # 09 Y:1995 09 1995 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $8,089 $4,295 Implemented
OK0478 # 11 Y:1995 11 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,300 $0 Implemented
OK0478 # 01 Y:1995 01 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $63,653 $25,000 Implemented
OK0478 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,578 $1,000 Implemented
OK0459 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $774 $795 Implemented