IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1075 # 05 Y:2024 05 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $712 $0 Implemented
UD1075 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $0 Implemented
UD1075 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $952 Implemented
UD1075 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,565 $2,238 Implemented
UD1075 # 06 Y:2024 06 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $5,142 $25,000 Not Implemented
UD1075 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,038 $7,596 Implemented
UD1075 # 07 Y:2024 07 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $712,662 $195,000 Implemented
WV0453 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $981 $1,400 Not Implemented
WV0453 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $1,960 $2,450 Not Implemented
WV0453 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $2,222 $938 Not Implemented
WV0453 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,045 $0 Not Implemented
WV0453 # 03 Y:2012 03 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,494 $12,500 Not Implemented
WV0453 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,920 $0 Implemented
WV0453 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $9,963 $2,600 Not Implemented
WV0453 # 07 Y:2012 07 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,239 $1,000 Implemented
WV0453 # 11 Y:2012 11 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $251 $800 Not Implemented
WV0453 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $753 $25 Not Implemented
WV0453 # 12 Y:2012 12 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $115 $100 Implemented
WV0453 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $834 $375 Implemented
WV0335 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $6,057 $240 Implemented
WV0335 # 08 Y:2006 08 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $985 $1,680 Implemented
WV0335 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,924 $250 Not Implemented
WV0335 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $1,420 Implemented
WV0335 # 01 Y:2006 01 2006 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $151,578 $97,142 Not Implemented
WV0335 # 07 Y:2006 07 2006 BURN WASTE OIL FOR HEAT $1,494 $1,300 Not Implemented