IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0778 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $77,393 $80,770 Not Implemented
UD0778 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,780 $12,000 Not Implemented
UD0778 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,222 $22,560 Not Implemented
UD0778 # 04 Y:2008 04 2008 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $5,905 $18,000 Not Implemented
UD0778 # 05 Y:2008 05 2008 UPGRADE CONTROLS ON COMPRESSORS $3,783 $0 Not Implemented
UD0778 # 06 Y:2008 06 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,431 $6,000 Not Implemented
UD0778 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,176 $0 Implemented
UD0778 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,563 $6,075 Implemented
UD0778 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,692 $5,992 Not Implemented
UD0778 # 10 Y:2008 10 2008 INSTALL OCCUPANCY SENSORS $1,683 $4,305 Implemented
UD0778 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,302 $0 Not Implemented
UD0778 # 12 Y:2008 12 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $853 $310 Not Implemented
UD0778 # 13 Y:2008 13 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $45 $0 Not Implemented
UL0246 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $20 Not Implemented
UL0246 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $44 Not Implemented
UL0246 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,128 $20,707 Not Implemented
UL0246 # 04 Y:2000 04 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $121 $0 Not Implemented
UL0246 # 05 Y:2000 05 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $23,625 $2,500 Not Implemented
UL0198 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $45,615 $47,600 Not Implemented
UL0198 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,727 $40 Not Implemented
UL0198 # 03 Y:1998 03 1998 WASH AND REUSE RAGS ON-SITE $99,250 $150,000 Not Implemented
UL0198 # 04 Y:1998 04 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $6,748 $0 Not Implemented
UL0198 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $60,000 $2,000 Not Implemented
UL0177 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $2,560 Not Implemented
UL0177 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $970 Not Implemented