IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0479 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,928 $4,833 Not Implemented
WV0479 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,776 $1,700 Not Implemented
WV0479 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,736 $19,676 Not Implemented
WV0479 # 11 Y:2013 11 2013 REPAIR OR REPLACE STEAM TRAPS $4,104 $6,095 Implemented
WV0479 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,996 $595 Implemented
WV0479 # 13 Y:2013 13 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,332 $3,845 Implemented
WV0479 # 14 Y:2013 14 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $559 $50 Implemented
LE0320 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,024 $2,093 Not Implemented
LE0320 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,159 $1,360 Implemented
LE0320 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,200 $5,076 Not Implemented
LE0320 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $356 $180 Implemented
LE0320 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $9,057 $19,312 Implemented
LE0320 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $6,336 $12,169 Not Implemented
WV0392 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,773 $18,784 Implemented
WV0392 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,132 $1,667 Implemented
WV0392 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,526 $6,750 Not Implemented
WV0392 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,525 $2,660 Not Implemented
WV0392 # 05 Y:2009 05 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,417 $1,000 Implemented
WV0392 # 06 Y:2009 06 2009 DEVELOP A REPAIR/REPLACE POLICY $3,444 $681 Implemented
WV0392 # 07 Y:2009 07 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,252 $392 Implemented
WV0392 # 08 Y:2009 08 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,814 $5,000 Not Implemented
WV0392 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,192 $0 Implemented
WV0392 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $660 Not Implemented
WV0392 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $416 $283 Implemented
LE0269 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $112,626 $500,000 Implemented