IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0779 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $303 $1,000 Implemented
GT0779 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $300 Implemented
GT0779 # 02 Y:2004 02 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $590 $2,700 Implemented
GT0779 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,183 $5,000 Implemented
GT0758 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,720 $47,268 Implemented
GT0758 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,420 $1,850 Implemented
GT0758 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $322 $0 Implemented
GT0758 # 02 Y:2003 02 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,072 $12,000 Implemented
GT0587 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,034 $0 Implemented
GT0587 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,400 $14,090 Implemented
GT0587 # 06 Y:1996 06 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $7,300 $503 Implemented
GT0580 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,630 $400 Implemented
GT0580 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $220 $0 Implemented
GT0580 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,160 $21,465 Implemented
GT0183 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $2,200 $909 Implemented
GT0183 # 06 Y:1983 06 1983 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $580 $360 Implemented
GT0183 # 03 Y:1983 03 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,850 $9,000 Implemented
GT0183 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,680 $11,600 Implemented
GT0183 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $200 Implemented
GT0111 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $814 $0 Implemented
GT0111 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $25 Implemented
GT0111 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $597 Implemented