IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0166 # 01 Y:2020 01 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $18,960 $212,180 Implemented
UU0166 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,448 $1,660 Not Implemented
UU0166 # 07 Y:2020 07 2020 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $443 $300 Implemented
UU0166 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,704 $52,483 Implemented
UU0166 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,409 $600 Implemented
UU0166 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,545 $1,200 Not Implemented
UU0166 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $912 $100 Not Implemented
UU0103 # 07 Y:2006 07 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $50 $115 Not Implemented
UU0103 # 04 Y:2006 04 2006 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $47,500 $23,700 Not Implemented
UU0103 # 03 Y:2006 03 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,760 $212 Not Implemented
UU0103 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $560 $25 Not Implemented
UU0103 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,610 $1,995 Not Implemented
UU0103 # 08 Y:2006 08 2006 INSTALL SPECTRAL REFLECTORS / DELAMP $730 $6,080 Not Implemented
UU0103 # 05 Y:2006 05 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,510 $5,000 Not Implemented
UU0103 # 06 Y:2006 06 2006 PAY BILLS ON TIME TO AVOID LATE FEES $706 $0 Not Implemented
UU0092 # 01 Y:2005 01 2005 USE SOY OR WATER-BASED INKS $28,070 $20,000 Not Implemented
UU0092 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,250 $19,000 Not Implemented
UU0092 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,083 $3,270 Not Implemented
UU0092 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,130 $1,800 Not Implemented
UU0092 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $740 $280 Not Implemented
UU0091 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,270 $7,000 Not Implemented
UU0091 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $420 Not Implemented
UU0091 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $180 Not Implemented
UU0091 # 04 Y:2005 04 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $250 $75 Not Implemented
UU0091 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $12,500 $15,290 Not Implemented