Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
822
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0582 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,534 | $9,736 | Implemented |
SD0582 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $342 | $760 | Implemented |
SF0540 # 01 Y:2019 | 01 | 2019 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,623 | $0 | Implemented |
SF0540 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,827 | $0 | Implemented |
SF0540 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,339 | $325 | Implemented |
SF0540 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,918 | $19,682 | Implemented |
SF0540 # 05 Y:2019 | 05 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $242 | $688 | Implemented |
SF0540 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,740 | $21,083 | Implemented |
CL1906 # 04 Y:2019 | 04 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $816 | $574 | Implemented |
CL1906 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,979 | $1,440 | Implemented |
CL1906 # 02 Y:2019 | 02 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $694 | $0 | Implemented |
CL1906 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,464 | $12,357 | Implemented |
UF0522 # 09 Y:2018 | 09 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,753 | $688 | Implemented |
UF0522 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $4,644 | $797 | Implemented |
UF0522 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,481 | $1,413 | Implemented |
UF0522 # 06 Y:2018 | 06 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,837 | $0 | Implemented |
UF0522 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,267 | $0 | Implemented |
UF0519 # 09 Y:2018 | 09 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,687 | $1,850 | Implemented |
UF0519 # 04 Y:2018 | 04 | 2018 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,569 | $45,225 | Implemented |
UF0519 # 01 Y:2018 | 01 | 2018 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $27,363 | $868 | Implemented |
LS1808 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $52 | $0 | Implemented |
LS1808 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $516 | $0 | Implemented |
LS1808 # 01 Y:2018 | 01 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $530 | $340 | Implemented |
AS0452 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $8,487 | Implemented |
AS0452 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,940 | $20 | Implemented |