Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1910 # 13 Y:2019 | 13 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,015 | $0 | Implemented |
UK1910 # 11 Y:2019 | 11 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,251 | $1,000 | Implemented |
UK1910 # 10 Y:2019 | 10 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,344 | $2,838 | Implemented |
UK1910 # 09 Y:2019 | 09 | 2019 | REDUCE FLUID FLOW RATES | $1,484 | $1,900 | Implemented |
UK1910 # 08 Y:2019 | 08 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,365 | $3,625 | Implemented |
UK1910 # 07 Y:2019 | 07 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $838 | $350 | Implemented |
UK1910 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $569 | $300 | Implemented |
UK1910 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,342 | $110,141 | Implemented |
UK1910 # 04 Y:2019 | 04 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,283 | $0 | Implemented |
UK1910 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $280 | $161 | Implemented |
UK1910 # 02 Y:2019 | 02 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $510 | $1,775 | Implemented |
UK1910 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,415 | $2,477 | Implemented |
UK1910 # 12 Y:2019 | 12 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,040 | $16,170 | Implemented |
UK1611 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $840 | $0 | Implemented |
UK1611 # 05 Y:2016 | 05 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,216 | $1,200 | Implemented |
UK1611 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,906 | $2,760 | Implemented |
UK1611 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $735 | $0 | Implemented |
UK1611 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $227 | $412 | Implemented |
UK1611 # 03 Y:2016 | 03 | 2016 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $12,000 | $3,000 | Implemented |
UD0781 # 11 Y:2008 | 11 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $800 | $0 | Implemented |
UD0781 # 10 Y:2008 | 10 | 2008 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,794 | $0 | Implemented |
UD0781 # 09 Y:2008 | 09 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $2,146 | $1,068 | Implemented |
UD0781 # 08 Y:2008 | 08 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,162 | $2,800 | Implemented |
UD0781 # 07 Y:2008 | 07 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,508 | $5,000 | Implemented |
UD0781 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $0 | Implemented |