Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0360 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,806 | $3,200 | Implemented |
LE0360 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $366 | $80 | Implemented |
LE0360 # 09 Y:2013 | 09 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $691 | $700 | Implemented |
LE0360 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,342 | $1,000 | Implemented |
LE0360 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,056 | $8,300 | Implemented |
RU0022 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $306 | $0 | Implemented |
RU0022 # 06 Y:1988 | 06 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $651 | $717 | Implemented |
RU0022 # 05 Y:1988 | 05 | 1988 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,352 | $1,575 | Implemented |
RU0022 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,410 | $252 | Implemented |
RU0006 # 07 Y:1987 | 07 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $718 | $1,204 | Implemented |
RU0006 # 03 Y:1987 | 03 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,672 | $0 | Implemented |
RU0006 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $4,140 | $396 | Implemented |
ST0013 # 08 Y:1985 | 08 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,042 | $42 | Implemented |
ST0013 # 07 Y:1985 | 07 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,713 | $178 | Implemented |
ST0013 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,073 | $400 | Implemented |
ST0013 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $964 | $0 | Implemented |
ST0013 # 04 Y:1985 | 04 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $766 | $880 | Implemented |
ST0013 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,533 | $700 | Implemented |
ST0013 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,468 | $1,367 | Implemented |
ST0013 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,678 | $56 | Implemented |
ST0010 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $32 | Implemented |
ST0010 # 11 Y:1984 | 11 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $910 | $537 | Implemented |
ST0010 # 09 Y:1984 | 09 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $228 | $150 | Implemented |
ST0010 # 06 Y:1984 | 06 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,423 | $74 | Implemented |
ST0010 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |