IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1611 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,216 $1,200 Implemented
UK1611 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,906 $2,760 Implemented
UK1611 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $735 $0 Implemented
UD0781 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $6,559 $9,000 Implemented
UD0781 # 01 Y:2008 01 2008 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $15,217 $4,000 Not Implemented
UD0781 # 02 Y:2008 02 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,566 $5,000 Implemented
UD0781 # 11 Y:2008 11 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $800 $0 Implemented
UD0781 # 10 Y:2008 10 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,794 $0 Implemented
UD0781 # 09 Y:2008 09 2008 INSTALL TIMERS AND/OR THERMOSTATS $2,146 $1,068 Implemented
UD0781 # 08 Y:2008 08 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,162 $2,800 Implemented
UD0781 # 07 Y:2008 07 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $2,508 $5,000 Implemented
UD0781 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $0 Implemented
UD0781 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $0 Not Implemented
UD0781 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $6,695 $2,100 Not Implemented
UD0778 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,780 $12,000 Not Implemented
UD0778 # 12 Y:2008 12 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $853 $310 Not Implemented
UD0778 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $77,393 $80,770 Not Implemented
UD0778 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,222 $22,560 Not Implemented
UD0778 # 04 Y:2008 04 2008 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $5,905 $18,000 Not Implemented
UD0778 # 05 Y:2008 05 2008 UPGRADE CONTROLS ON COMPRESSORS $3,783 $0 Not Implemented
UD0778 # 06 Y:2008 06 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,431 $6,000 Not Implemented
UD0778 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,176 $0 Implemented
UD0778 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,563 $6,075 Implemented
UD0778 # 13 Y:2008 13 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $45 $0 Not Implemented
UD0778 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,302 $0 Not Implemented