Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,905
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0335 # 06 Y:2006 | 06 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,785 | $5,803 | Implemented |
WV0335 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $1,420 | Implemented |
WV0335 # 08 Y:2006 | 08 | 2006 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $985 | $1,680 | Implemented |
WV0335 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $6,057 | $240 | Implemented |
WV0335 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,924 | $250 | Not Implemented |
WV0335 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $127,911 | $14,450 | Implemented |
WV0335 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $151,578 | $97,142 | Not Implemented |
MA0598 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $25,324 | $45,333 | Not Implemented |
MA0598 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,748 | $1,125 | Implemented |
MA0598 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,315 | $18,065 | Implemented |
MA0598 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $4,500 | $4,314 | Implemented |
MA0598 # 05 Y:2006 | 05 | 2006 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $2,571 | $3,000 | Not Implemented |
MA0598 # 06 Y:2006 | 06 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $716 | $500 | Not Implemented |
MA0598 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $300 | Implemented |
UU0092 # 01 Y:2005 | 01 | 2005 | USE SOY OR WATER-BASED INKS | $28,070 | $20,000 | Not Implemented |
UU0092 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,250 | $19,000 | Not Implemented |
UU0092 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,083 | $3,270 | Not Implemented |
UU0092 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $1,130 | $1,800 | Not Implemented |
UU0092 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $740 | $280 | Not Implemented |
UU0091 # 01 Y:2005 | 01 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,270 | $7,000 | Not Implemented |
UU0091 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,360 | $420 | Not Implemented |
UU0091 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $180 | Not Implemented |
UU0091 # 04 Y:2005 | 04 | 2005 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $250 | $75 | Not Implemented |
UU0091 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $12,500 | $15,290 | Not Implemented |
BD0294 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,821 | $400 | Implemented |