Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0584 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $356 | Implemented |
UM0107 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,746 | $3,572 | Not Implemented |
UM0107 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $250 | $250 | Not Implemented |
UM0107 # 03 Y:1998 | 03 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,179 | $250 | Not Implemented |
UM0107 # 06 Y:1998 | 06 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $14,550 | $5,200 | Not Implemented |
UM0107 # 04 Y:1998 | 04 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $130 | $100 | Not Implemented |
UM0107 # 05 Y:1998 | 05 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $10,400 | $2,250 | Not Implemented |
UD0526 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,181 | $11,751 | Implemented |
UD0526 # 02 Y:1997 | 02 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,197 | $5,000 | Implemented |
UD0526 # 01 Y:1997 | 01 | 1997 | OPTIMIZE PLANT POWER FACTOR | $14,725 | $15,000 | Implemented |
UD0524 # 02 Y:1997 | 02 | 1997 | USE OPTIMUM THICKNESS INSULATION | $1,914 | $9,400 | Implemented |
UD0524 # 01 Y:1997 | 01 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,145 | $0 | Implemented |
UD0524 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,568 | $0 | Not Implemented |
UD0524 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,898 | $16,158 | Implemented |
UD0524 # 05 Y:1997 | 05 | 1997 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $5,400 | $22,500 | Implemented |
UD0410 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,630 | $2,630 | Not Implemented |
UD0410 # 05 Y:1993 | 05 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,462 | $22,462 | Implemented |
UD0410 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,156 | $5,156 | Implemented |
UD0410 # 03 Y:1993 | 03 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,000 | $12,000 | Implemented |
UD0410 # 02 Y:1993 | 02 | 1993 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $0 | $0 | Not Implemented |
UD0410 # 01 Y:1993 | 01 | 1993 | OPTIMIZE PLANT POWER FACTOR | $2,250 | $2,250 | Not Implemented |
UD0410 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,650 | $4,650 | Not Implemented |
UD0315 # 03 Y:1990 | 03 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $33,180 | $70,000 | Implemented |
UD0313 # 01 Y:1990 | 01 | 1990 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,744 | $20,000 | Implemented |
UD0313 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $240 | Not Implemented |