IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0080 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,819 $0 Implemented
MZ0080 # 05 Y:2012 05 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,554 $0 Not Implemented
MZ0080 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,580 $850 Implemented
MZ0080 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $306 $0 Not Implemented
MZ0080 # 03 Y:2012 03 2012 CONDENSE OPERATION INTO ONE BUILDING $13,624 $0 Implemented
MZ0080 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,548 $600 Implemented
MZ0080 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,028 $35,700 Implemented
MZ0050 # 05 Y:2010 05 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $916 $1,000 Not Implemented
MZ0050 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $15,507 $0 Implemented
MZ0050 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,053 $1,160 Not Implemented
MZ0050 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,616 $0 Implemented
MZ0050 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,280 $0 Not Implemented
MZ0050 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $6,000 Implemented
MZ0050 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $24,897 $5,000 Implemented
MZ0050 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $311 $1,250 Not Implemented
IA0369 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $464 $51 Not Implemented
IA0369 # 12 Y:2005 12 2005 INSTALL OCCUPANCY SENSORS $809 $2,233 Not Implemented
IA0369 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,703 $2,772 Not Implemented
IA0369 # 09 Y:2005 09 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $499,200 $800,000 Not Implemented
IA0369 # 08 Y:2005 08 2005 REDUCE SCRAP PRODUCTION $49,000 $500 Not Implemented
IA0369 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,035 $160 Not Implemented
IA0369 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $349 Not Implemented
IA0369 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $304 Not Implemented
IA0369 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,440 $1,650 Not Implemented
IA0369 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,908 $1,094 Not Implemented