Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0198 # 04 Y:1998 | 04 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $6,748 | $0 | Not Implemented |
UL0198 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,727 | $40 | Not Implemented |
UL0198 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $60,000 | $2,000 | Not Implemented |
UL0198 # 03 Y:1998 | 03 | 1998 | WASH AND REUSE RAGS ON-SITE | $99,250 | $150,000 | Not Implemented |
UL0198 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $45,615 | $47,600 | Not Implemented |
OD0116 # 05 Y:1998 | 05 | 1998 | USE SYNTHETIC LUBRICANT | $255 | $255 | Implemented |
OD0116 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $95 | $91 | Implemented |
OD0116 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $921 | $800 | Implemented |
OD0116 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $925 | $2,175 | Implemented |
OD0116 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,986 | $1,615 | Not Implemented |
OD0113 # 02 Y:1998 | 02 | 1998 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $15,720 | $21,621 | Implemented |
OD0113 # 07 Y:1998 | 07 | 1998 | OPTIMIZE PLANT POWER FACTOR | $9,036 | $50,000 | Implemented |
OD0113 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,794 | $14,284 | Implemented |
OD0113 # 05 Y:1998 | 05 | 1998 | REDUCE VENTILATION AIR | $1,897 | $0 | Not Implemented |
OD0113 # 04 Y:1998 | 04 | 1998 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $209 | $250 | Not Implemented |
OD0113 # 01 Y:1998 | 01 | 1998 | ELIMINATE/REDUCE AN OPERATION | $22,713 | $0 | Not Implemented |
OD0113 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,820 | $1,091 | Implemented |
CO0421 # 04 Y:1998 | 04 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $2,040 | $0 | Not Implemented |
CO0421 # 05 Y:1998 | 05 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,380 | $0 | Not Implemented |
CO0421 # 06 Y:1998 | 06 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $37,620 | $15,460 | Not Implemented |
CO0421 # 03 Y:1998 | 03 | 1998 | CONVERT TO AQUEOUS CLEANING | $11,718 | $1,500 | Not Implemented |
CO0421 # 02 Y:1998 | 02 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $910 | $2,500 | Not Implemented |
CO0421 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $6,811 | Not Implemented |
HO0184 # 09 Y:1998 | 09 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $21,459 | $27,500 | Not Implemented |
HO0184 # 08 Y:1998 | 08 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $4,469 | $200 | Implemented |