IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

543

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0483 # 14 Y:2014 14 2014 REPAIR OR REPLACE STEAM TRAPS $841 $2,878 Implemented
WV0479 # 02 Y:2013 02 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $32,413 $1,000 Implemented
WV0479 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $15,736 $4,480 Implemented
WV0479 # 05 Y:2013 05 2013 DEVELOP A REPAIR/REPLACE POLICY $9,967 $1,388 Implemented
WV0479 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,444 $1,100 Implemented
WV0479 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $6,892 $1,275 Implemented
WV0479 # 11 Y:2013 11 2013 REPAIR OR REPLACE STEAM TRAPS $4,104 $6,095 Implemented
WV0479 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,996 $595 Implemented
WV0479 # 13 Y:2013 13 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,332 $3,845 Implemented
WV0479 # 14 Y:2013 14 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $559 $50 Implemented
UA0109 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,846 $46,099 Implemented
UA0109 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,107 $5,850 Implemented
SF0437 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $911 $0 Implemented
SF0437 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,792 $6,796 Implemented
SF0437 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $425 $729 Implemented
SF0437 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $14,135 Implemented
SF0437 # 08 Y:2013 08 2013 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,796 $43,156 Implemented
SF0437 # 09 Y:2013 09 2013 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,489 $13,500 Implemented
WV0467 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,786 $2,550 Implemented
WV0467 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,901 $1,000 Implemented
WV0467 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,844 $500 Implemented
WV0467 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $248 Implemented
WV0467 # 11 Y:2013 11 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,059 $571 Implemented
WV0467 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $45 Implemented
WV0453 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,920 $0 Implemented