IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

537

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0351 # 01 Y:2006 01 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,565 $20,410 Implemented
WV0351 # 05 Y:2006 05 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,122 $1,000 Implemented
WV0351 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,042 $0 Implemented
WV0351 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,639 $117 Implemented
WV0351 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,561 $1,635 Implemented
WV0351 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $876 $32 Implemented
UM0311 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $450 Implemented
UM0311 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,319 $6,620 Implemented
UM0311 # 08 Y:2006 08 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,983 $1,000 Implemented
UM0311 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,525 $375 Implemented
UM0311 # 10 Y:2006 10 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,316 $370 Implemented
UM0311 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $578 $659 Implemented
LM0107 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,219 $2,200 Implemented
LM0107 # 03 Y:2006 03 2006 $225,208 $12,980 Implemented
LM0107 # 04 Y:2006 04 2006 $178,334 $5,400 Implemented
LM0107 # 05 Y:2006 05 2006 $16,864 $1,000 Implemented
LM0107 # 06 Y:2006 06 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,251 $1,000 Implemented
UD0731 # 01 Y:2005 01 2005 $54,200 $60,000 Implemented
UD0731 # 07 Y:2005 07 2005 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $12,378 $0 Implemented
UD0731 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,841 $0 Implemented
UD0731 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,953 $15,113 Implemented
UD0731 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $1,894 $0 Implemented
UD0731 # 14 Y:2005 14 2005 UPGRADE CONTROLS ON COMPRESSORS $1,010 $0 Implemented
UD0731 # 15 Y:2005 15 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $622 $0 Implemented
LE0223 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,650 $50 Implemented