IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 2761 Manifold Business Forms
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0928 # 13 Y:2015 13 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $581 $468 Not Implemented
OK0928 # 01 Y:2015 01 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $21,773 $7,320 Implemented
OK0928 # 02 Y:2015 02 2015 INSTALL SET-BACK TIMERS $2,950 $972 Implemented
OK0928 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $149 $132 Implemented
OK0928 # 04 Y:2015 04 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,143 $18,884 Not Implemented
OK0928 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $988 $2,440 Not Implemented
OK0928 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,832 $38,110 Implemented
OK0928 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $5,149 Implemented
OK0928 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,212 $863 Implemented
OK0928 # 10 Y:2015 10 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,912 $5,775 Not Implemented
OK0928 # 11 Y:2015 11 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,000 $70,000 Implemented
OK0928 # 12 Y:2015 12 2015 OPTIMIZE PLANT POWER FACTOR $2,621 $20,000 Not Implemented
OK0928 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,758 $25,753 Implemented
OK0282 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $616 $0 Implemented
OK0282 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $616 Implemented
OK0282 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,240 $15,500 Implemented
OK0282 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $505 $622 Not Implemented
OK0282 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,924 $1,809 Implemented
OK0282 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,638 $0 Implemented
OK0282 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $894 $215 Implemented
OK0282 # 08 Y:1989 08 1989 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,879 $15,700 Not Implemented
OK0282 # 09 Y:1989 09 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,664 $23,469 Not Implemented
OK0211 # 08 Y:1986 08 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,395 $1,500 Implemented
OK0211 # 10 Y:1986 10 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,185 $476 Implemented
OK0211 # 09 Y:1986 09 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,017 $14,850 Implemented