IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
SIC 278 Blankbooks And Bookbinding
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0172 # 04 Y:1998 04 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $708 $990 Not Implemented
HO0172 # 05 Y:1998 05 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $316 $47 Implemented
HO0172 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,907 $1,500 Not Implemented
HO0172 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $500 $2,000 Not Implemented
HO0172 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $575 $20 Implemented
HO0172 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $13,312 Implemented
HO0172 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,492 $300 Implemented
UM0106 # 06 Y:1998 06 1998 INSTALL AN UNINTERUPTABLE POWER SUPPLY $27,848 $10,800 n/a
UM0106 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,065 $9,154 n/a
UM0106 # 04 Y:1998 04 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,804 $1,580 n/a
UM0106 # 03 Y:1998 03 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,250 $100 n/a
UM0106 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $727 $1,000 n/a
UM0106 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $866 $1,540 n/a
UM0101 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,749 $36,857 Implemented
UM0101 # 06 Y:1998 06 1998 $28,625 $2,800 Implemented
UM0101 # 05 Y:1998 05 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $29,383 $3,166 Implemented
UM0101 # 04 Y:1998 04 1998 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $20,800 $200 Implemented
UM0101 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $3,067 $2,520 Implemented
UM0101 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $509 $1,000 Not Implemented
KG0075 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,653 $972 Not Implemented
KG0075 # 01 Y:1996 01 1996 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $26,746 $0 Implemented
KG0075 # 02 Y:1996 02 1996 INSTALL TIMERS AND/OR THERMOSTATS $10,802 $1,350 Implemented
KG0075 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,507 $25 Not Implemented
KG0075 # 06 Y:1996 06 1996 REVISE RAW MATERIAL SPECS $11,050 $0 Not Implemented
KG0075 # 03 Y:1996 03 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,390 $0 Implemented