IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 2782 Blankbooks And Looseleaf Binders
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0306 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,063 $89,988 Not Implemented
MS0306 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,113 $36,171 Not Implemented
MS0306 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,662 $2,550 Implemented
MS0306 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $948 $4,566 Not Implemented
MS0306 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,093 $180 Implemented
CO0445 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $5,830 $0 Not Implemented
CO0445 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $380 Not Implemented
CO0445 # 06 Y:1999 06 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $360 $0 Not Implemented
CO0445 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $140 $0 Not Implemented
CO0445 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $1,000 Implemented
CO0445 # 03 Y:1999 03 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $820 $1,000 Implemented
CO0445 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $0 Not Implemented
CO0445 # 08 Y:1999 08 1999 $44,000 $1,400 Not Implemented
MS0127 # 03 Y:1999 03 1999 SHUT OFF PILOTS IN STANDBY EQUIPMENT $140 $54 Implemented
MS0127 # 07 Y:1999 07 1999 $115,929 $8,265 Not Implemented
MS0127 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,685 $1,202 Implemented
MS0127 # 02 Y:1999 02 1999 INSTALL TIMERS AND/OR THERMOSTATS $584 $236 Implemented
MS0127 # 04 Y:1999 04 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,782 $11,500 Not Implemented
MS0127 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $393 $101 Not Implemented
MS0127 # 08 Y:1999 08 1999 $156,180 $23,010 Implemented
MS0127 # 06 Y:1999 06 1999 USE RE-USABLE FILTERS $14,954 $14,960 Not Implemented
HO0172 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $13,312 Implemented
HO0172 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,492 $300 Implemented
HO0172 # 05 Y:1998 05 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $316 $47 Implemented
HO0172 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $575 $20 Implemented