Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsSIC | 2782 | Blankbooks And Looseleaf Binders |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0172 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,492 | $300 | Implemented |
HO0172 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $575 | $20 | Implemented |
HO0172 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,879 | $13,312 | Implemented |
KG0075 # 05 Y:1996 | 05 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,507 | $25 | Not Implemented |
KG0075 # 03 Y:1996 | 03 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,390 | $0 | Implemented |
KG0075 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,653 | $972 | Not Implemented |
KG0075 # 01 Y:1996 | 01 | 1996 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $26,746 | $0 | Implemented |
KG0075 # 02 Y:1996 | 02 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $10,802 | $1,350 | Implemented |
KG0075 # 06 Y:1996 | 06 | 1996 | REVISE RAW MATERIAL SPECS | $11,050 | $0 | Not Implemented |
AM0278 # 02 Y:1996 | 02 | 1996 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,050 | $29,160 | Implemented |
AM0278 # 09 Y:1996 | 09 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $12,270 | $2,500 | Implemented |
AM0278 # 08 Y:1996 | 08 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $27,000 | $0 | Implemented |
AM0278 # 07 Y:1996 | 07 | 1996 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $680 | $0 | Implemented |
AM0278 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $410 | Implemented |
AM0278 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,600 | $300 | Implemented |
AM0278 # 04 Y:1996 | 04 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,150 | $800 | Implemented |
AM0278 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,900 | $140 | Implemented |
AM0278 # 01 Y:1996 | 01 | 1996 | INSTALL SPECTRAL REFLECTORS / DELAMP | $11,610 | $55,390 | Implemented |
MA0356 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,644 | $3,000 | Implemented |
MA0356 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $448 | $0 | Not Implemented |
MA0356 # 04 Y:1996 | 04 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,672 | $10,000 | Not Implemented |
MA0356 # 01 Y:1996 | 01 | 1996 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,400 | $118,450 | Implemented |
MA0356 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,838 | $0 | Implemented |
KG0038 # 06 Y:1995 | 06 | 1995 | USE SYNTHETIC LUBRICANT | $296 | $0 | Implemented |
KG0038 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $370 | $40 | Implemented |