IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,000

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0097 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,250 $18,608 Implemented
MO0097 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,959 $28,210 Implemented
MO0097 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,375 $225 Implemented
MO0097 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,153 $1,595 Implemented
MO0097 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,627 $1,200 Implemented
MA0282 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,828 $23,220 Implemented
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented
MA0282 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $230 Implemented
UD0408 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,008 $1,500 Implemented
UD0408 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,052 $21,676 Implemented
UD0408 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $0 Implemented
UD0408 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,391 $10,000 Implemented
UD0408 # 05 Y:1993 05 1993 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $3,000 Implemented
NC0006 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $428 Implemented
NC0006 # 03 Y:1993 03 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,860 $600 Implemented
NC0006 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,688 $5,010 Implemented
NC0006 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,061 $120 Implemented
UD0407 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,303 $6,000 Implemented
UD0407 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,300 $1,000 Implemented
UD0407 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,563 $500 Implemented
UD0407 # 04 Y:1993 04 1993 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,346 $1,500 Implemented
ND0157 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,365 $2,297 Implemented
ND0157 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $352 $300 Implemented