IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $3,677 $13,959 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $563 $48 Implemented
LL0271 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,710 $3,760 Implemented
LL0271 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $5,905 Implemented
LL0271 # 07 Y:2007 07 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,580 $2,366 Implemented
LL0271 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $1,886 $1,500 Implemented
LL0271 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $365 $638 Implemented
LL0271 # 10 Y:2007 10 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $252 $454 Implemented
SF0340 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,354 $0 Implemented
SF0340 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $12,059 $320 Implemented
SF0340 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $6,510 $0 Implemented
SF0340 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $155,963 $36,556 Implemented
SF0340 # 08 Y:2007 08 2007 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,828 $1,892 Implemented
SF0340 # 12 Y:2007 12 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,702 $15,428 Implemented
SF0340 # 13 Y:2007 13 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,410 $3,712 Implemented
SF0340 # 15 Y:2007 15 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,697 $37,793 Implemented
SF0340 # 16 Y:2007 16 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,354 $70,400 Implemented
UF0397 # 01 Y:2007 01 2007 INSTALL SET-BACK TIMERS $504 $144 Implemented
UF0397 # 02 Y:2007 02 2007 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $5,429 $12,800 Implemented
UF0397 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $590 Implemented
UF0397 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $0 Implemented
UF0397 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $6,526 Implemented